Sourcing in the construction industry
Sourcing is an activity that involves looking for suppliers of goods and services required to achieve a particular end. Taken literally, the term means finding the source of something. So, in construction, the source of the reinforced concrete floor planks that are required will be either the manufacturer or the supplier of those planks. When a party is awarded the contract, they then become a part of the overall supply chain for the project.
Sourcing of materials, labour and services may be undertaken by any of the stakeholders during the project:
- An architect may wish to source suppliers of glazed bricks.
- An engineer may require to source manufacturers of steel angles.
- A contractor may want to source agencies that supply labourers.
In all cases on a project, sourcing will usually aim to complete one part of the project, so a building project will comprise multiple acts of sourcing.
The process of identifying a specific supplier that will be contracted, and then agreeing terms with them, is generally referred to as procurement.
[edit] Related articles on Designing Buildings
- Action programme for responsible and ethical sourcing.
- Australian ethical labour sourcing standard.
- Code of conduct.
- Complex outsourcing.
- Consultancy playbook.
- Corporate social responsibility in construction.
- Critical service contracts.
- Critical suppliers.
- Ethical labour sourcing standard.
- Expected market cost.
- International Ethics Standards Coalition.
- Management Consultancy Framework MCF.
- Mixed economy.
- Model Services Contract MSC.
- Modern Slavery Act and sustainable supply chains.
- Modern slavery and the supply chain.
- Public sector dependent suppliers.
- Recyclable construction materials.
- Sourcing playbook.
- Spark framework RM6094.
Featured articles and news
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
New project and cultural district described in detail.
The nature of EPCs, crticism and inaccuracies.
History, issues and redesign.
From waste recycling to energy performance the hierchy.
An introduction to WERCS and WEEE responsibilities
Dealing with 2 million tonnes of waste equipment a year.
Global BACS Market: analytics and optimisation
A BSRIA glance at building automation and control systems.
What it is and how to use it.
Types of insulating plaster by binder and insulant.
Investors in People: CIOB achieves gold
Reflecting a commitment to employees and members.
Scratching beneath the surface; a guide to selection.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.
UK gov apprenticeship funding from April 2024
Brief summary the policy paper updated in March.
For the World Autism Awareness Month of April.